moveable 40 ton lifter diesel run mini container gantry crane
A variant of a bridge crane. It is mainly employed for loading and unloading functions of out of doors freight yards, substance yards and bulk cargoes. Its metal composition is like a doorway-shaped body. It is mounted under the principal beam and has two legs. It can stroll directly on the keep track of on the floor. The two ends of the principal beam can have an overhanging cantilever beam.
The solitary principal beam gantry crane has a straightforward framework, convenient production and installation, and its personal small high quality, and the principal beam is largely a derailed box-formed frame framework. Compared to double girder gantry cranes, the all round stiffness is weaker. As a result, when the lifting excess weight Q ≤ 50 t and the span S ≤ 35 m, this kind can be used. The single primary girder gantry crane has two types of L-shaped and C-formed legs. The L-kind is effortless to manufacture and set up, and the drive is excellent, and its own good quality is little. Nonetheless, the place for lifting cargo by means of the legs is relatively tiny. The C-shaped legs are created to be inclined or curved, with the goal of possessing a large lateral room for the goods to pass easily by means of the legs.
Rated load/ton | 5 | 10 | 16 | 20 | 32 |
Span/m | ten-40 | ||||
Lifting top/m | 30 | ||||
Functioning class | A3/1bM | ||||
Lifting pace/m/min | 8 | 7 | three.five | 3.five | three |
Trolley running speed/m/min | twenty | 20 | twenty | twenty | 20 |
Crane running velocity/m/min | 20 | 20 | twenty | twenty | 20 |
Lifeless fat/t | ten.5~37.5 | 16.8~fifty two | 18.nine~65 | 24.5~77 | 27.five~98 |
Number of wheel | 4 | 4 | 4 | 4 | 4/8 |
Max. wheel force/KN | 52.five~twelve.1 | 95~183 | 131~242 | 167~298 | 238~forty one.five |
Metal keep track of advised | P24 | P38 | P43 | P43 | P43 |
Gantry crane protection safety
1. Overload limiter.
2. Higher good quality, lengthy-time period use, effect-resistant polyurethane buffer.
3. Crane vacation restrict switch.
four. Decline of strain defense, stage security.
five. Crisis parking technique.
6. Raise the height limiter.
About the solution: Please notify the subsequent data so that we can confirm your needs faster!
one. Lifting capacity.
2. Span (keep track of centre to rail centre)
three. Lifting height (hook heart grounding)
four. Whether it demands to be overhanged (you should offer the overhang duration)
five. Require rails and cables? (make sure you provide the running size)
6. Other unique specifications