Merchandise DESCRIPTION
ten Ton Topkit Tower Crane
This collection of tower cranes, ranging from SATW1 has a horizontal jib body, a jib-trolley radius-changing mechanism and a
hydraulic self-elevating system. It is original in layout, reliable in procedure and satisfactory in shape. Equipped with all
needed security gadgets, these cranes demonstrate a excellent pace-management capacity, satisfactory functioning balance and higher operate
performance. They can be broadly used for the design of high-rise accommodations, residential properties, large-increase industrial buildings,
big-span manufacturing facility buildings and tower-like structures like tall chimneys.
Principal complex parameters for SATW1 tower crane:
Certificate |
CE,CZPT,Gost, |
||||
lifting moment |
1250KN.m |
||||
Largest lifting fat |
10t |
||||
Greatest doing work selection/lifting excess weight |
60m/1.6t |
||||
Smallest functioning assortment |
two.5m |
||||
CZPTing height |
Set sort |
50m |
|||
Attached kind |
161m |
||||
CZPTing technique (world differential kind) |
CZPTing pace/
Biggest lifting fat |
Two falls |
4 falls |
||
m /min |
t |
m /min |
t |
||
3.six |
5 |
1.eighty five |
ten |
||
twelve.5 |
five |
5.seventy eight |
ten |
||
forty.2 |
five |
twenty |
10 |
||
fifty three.six |
two.five |
26.three |
five |
||
eighty |
2.5 |
forty |
five |
||
slewing method |
Slewing speed |
.6r/min |
|||
Trolley method |
Trolley velocity |
twenty five/51m/min |
|||
Jacking program |
Ranking jacking pace |
.5m/min |
|||
Lifting boom’s duration/correspond well balanced weight |
60/15.7m/t |
||||
Crane whole bodyweight |
53t |
||||
crane overall electrical power(not such as the hoisting motor) |
60kw |
||||
Mast section’s size (dimension) |
1.8×1.8×3.0m |
||||
Section’s dimension of the lifting growth |
one.356×1.00m |
Characteristic & edge
1.ideal for all types of construction initiatives and can function below all types of perform problem.
two.It has a substantial doing work pace, great pace-modifying functionality, steady operation, and high effectiveness.
three.The crane has a complete established of protection devices, which can assure the secure and substantial-performance operation of the
equipment.
four. 3-pace motor and mono-velocity ratio decelerators are applied in the lifting construction, which permits weighty load
minimal pace
and light load high pace.
5.Planet gear decelerator is utilized in the circumgyrating composition, jointly with instant-restricting hydraulic coupler, which
can comprehend substantial load capability, constant beginning, and reputable procedure.
one. Overload protection:If the material is over the capacity, the crane will give a sharp warning for protection itself
2. Emergency brake: If the operation staff encounters some emergency situation, we could start the emergency brake
technique to protection the related treasure.
three. Control Method: Room control or remote control to avoid any injure to the operation staff
four. Main lifting motor: with thermal protection and currency protection
Our Factory
Packing & Shipping